Mod Con 300 Specifications

Browse online or download Specifications for Water heaters & boilers Mod Con 300. Mod Con 300 Specifications User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 73
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
120 Braley Rd. P.O. Box 429 East Freetown, MA 02717-0429 www.htproducts.com
LP- 276 REV. 9.4.14
Mod Con VWH
INSTALLATION
START-UP
MAINTENANCE
PARTS
VWH Models
300 / 500 / 850
LP / HL / LPHL
Heat Exchanger Bears the ASME “H” Stamp
NOTICE: HTP reserves the right to make product changes or updates without notice and will not be held liable for typographical errors
in literature.
NOTE TO CONSUMER: PLEASE KEEP ALL INSTRUCTIONS FOR FUTURE REFERENCE.
This manual must only be used by a qualified heating installer/service technician. Read all instructions in this manual before installing.
Perform steps in the order given. Failure to comply could result in substantial property damage, severe personal injury, or death.
Page view 0
1 2 3 4 5 6 ... 72 73

Summary of Contents

Page 1 - Mod Con VWH

120 Braley Rd. P.O. Box 429 East Freetown, MA 02717-0429 www.htprod

Page 2 - WHAT TO DO IF YOU SMELL GAS

10 LP- 276 REV. 9.4.14 Supply Water Temperature Sensor – Thi

Page 3 - FOR THE INSTALLER

11 LP- 276 REV. 9.4.14 The service life of the boiler’s ex

Page 4 - TABLE OF CONTENTS

12 LP- 276 REV. 9.4.14 Figure 2 – Dimensions and Specificat

Page 5

13 LP- 276 REV. 9.4.14 C. CLEARANCES FOR SERVICE ACCESS See

Page 6 - A. PRECAUTIONS

14 LP- 276 REV. 9.4.14 PRODUCTS TO AVOID AREAS LIKELY TO HAV

Page 7 - PART 2 – BEFORE YOU START

15 LP- 276 REV. 9.4.14 H. UNCRATING AND MOVING BOILER Uncr

Page 8

16 LP- 276 REV. 9.4.14 B. RELIEF VALVE Connect discharge p

Page 9 - [1,251] x 1.43

17 LP- 276 REV. 9.4.14 The boiler is designed to be connecte

Page 10 - C. OPTIONAL EQUIPMENT

18 LP- 276 REV. 9.4.14 5. Feed green ground wire into

Page 11 - B. LEVELING AND DIMENSIONS

19 LP- 276 REV. 9.4.14 F. SCALDING When raising tank temp

Page 12

2 LP- 276 REV. 9.4.14 IF THE INFORMATION IN THIS MANUAL IS

Page 13

20 LP- 276 REV. 9.4.14 Table 8 – Mod Con Heat Exchanger Pr

Page 14

21 LP- 276 REV. 9.4.14 pH of Water pH is a measure of rela

Page 15 - PART 4 – BOILER PIPING

22 LP- 276 REV. 9.4.14 I. PIPING DIAGRAMS Figure 6

Page 16 - D. CIRCULATOR PUMPS

23 LP- 276 REV. 9.4.14 Figure 7 NOTES: 1. This drawing is m

Page 17

24 LP- 276 REV. 9.4.14 Figure 8 NOTES: 1. This drawing is m

Page 18

25 LP- 276 REV. 9.4.14 Figure 9 NOTES: 1. This drawing is m

Page 19 - F. SCALDING

26 LP- 276 REV. 9.4.14 Figure 10 NOTES: 1. This drawing is

Page 20 - H. WATER CHEMISTRY

27 LP- 276 REV. 9.4.14 Figure 11 NOTES: 1. This drawing is

Page 21

28 LP- 276 REV. 9.4.14 Figure 12 NOTES: 1. This drawing is

Page 22 - I. PIPING DIAGRAMS

29 LP- 276 REV. 9.4.14 1. Installation should be made in acc

Page 23 - Figure 7

3 LP- 276 REV. 9.4.14 The following defined terms are used

Page 24

30 LP- 276 REV. 9.4.14 • The air inlet and exhaust comp

Page 25

31 LP- 276 REV. 9.4.14 Figure 13 D. EXHAUST VENT AND INTAKE

Page 26

32 LP- 276 REV. 9.4.14 NOTE: In Canada, follow CAN/CGA B14

Page 27

33 LP- 276 REV. 9.4.14 Figure 14 – Condensate Piping NOTE:

Page 28 - A. GENERAL

34 LP- 276 REV. 9.4.14 2. The total combined equivalent len

Page 29

35 LP- 276 REV. 9.4.14 6. To prevent water leakage, install

Page 30

36 LP- 276 REV. 9.4.14 I. SIDEWALL VENTING DIAGRAMS Figure

Page 31

37 LP- 276 REV. 9.4.14 Figure 17 – Sidewall Venting with Te

Page 32

38 LP- 276 REV. 9.4.14 J. VERTICAL VENTING DIAGRAMS Figure

Page 33

39 LP- 276 REV. 9.4.14 Figure 19 – Roof and Sidewall Ventin

Page 34 - F. LONGER VENT RUNS

4 LP- 276 REV. 9.4.14 The latest version of the National Ele

Page 35

40 LP- 276 REV. 9.4.14 PART 6 – GAS PIPING FAILURE TO FOLL

Page 36 - I. SIDEWALL VENTING DIAGRAMS

41 LP- 276 REV. 9.4.14 Never use an open flame (match or l

Page 37

42 LP- 276 REV. 9.4.14 The gas piping must be sized for the

Page 38 - J. VERTICAL VENTING DIAGRAMS

43 LP- 276 REV. 9.4.14 Figure 22 – Mod Con 850 Gas Valve D

Page 39

44 LP- 276 REV. 9.4.14 PART 7 – FIELD WIRING ELECTRICAL SH

Page 40 - PART 6 – GAS PIPING

45 LP- 276 REV. 9.4.14 use of a pipe sensor will be somewhat

Page 41 - D. CHECK INLET GAS PRESSURE

46 LP- 276 REV. 9.4.14 F. LOW VOLTAGE CONNECTIONS FOR STANDA

Page 42 - E. GAS VALVE

47 LP- 276 REV. 9.4.14 Figure 25 – LP-205-JJ Figure 26 – C

Page 43

48 LP- 276 REV. 9.4.14 Figure 27 – Mod Con VWH Cascade Mast

Page 44 - PART 7 – FIELD WIRING

49 LP- 276 REV. 9.4.14 Figure 28 – Mod Con Internal Connect

Page 45 - E. ALARM CONNECTIONS

5 LP- 276 REV. 9.4.14 C. SYSTEM WATER PIPING METHODS ...

Page 46

50 LP- 276 REV. 9.4.14 PART 8 – START-UP PREPARATION A. CHEC

Page 47

51 LP- 276 REV. 9.4.14 Sodium: 20 mGL B. CHECK FOR GAS LEAKS

Page 48

52 LP- 276 REV. 9.4.14 When a demand for hot water is receiv

Page 49

53 LP- 276 REV. 9.4.14 d. Verify that parameter 15 is set to

Page 50

54 LP- 276 REV. 9.4.14 pressing on top of the plastic cover

Page 51 - C. CONDENSATE REMOVAL

55 LP- 276 REV. 9.4.14 |d4| — Not used. |d5| — Not used.

Page 52 - G. LOCKOUT CONDITION

56 LP- 276 REV. 9.4.14 MOD CON FAN SPEEDS MODEL IGNITION MIN

Page 53 - PART 9 – START-UP PROCEDURE

57 LP- 276 REV. 9.4.14 20 2 Flow switch. Do not change. 0 =

Page 54 - C. STATUS MENU

58 LP- 276 REV. 9.4.14 C. BOILER FAULT 1. When a fault condi

Page 55 - D. TEST MODE

59 LP- 276 REV. 9.4.14 E03 System sensor failure (Cascade Ma

Page 56 - C. PROGRAM NAVIGATION

6 LP- 276 REV. 9.4.14 B. CHECK FOR GAS LEAKS ...

Page 57 - PART 11 – TROUBLESHOOTING

60 LP- 276 REV. 9.4.14 F20 Condensate cup is full 1. Check

Page 58 - C. BOILER FAULT

61 LP- 276 REV. 9.4.14 The combustion chamber insulation i

Page 59 - Table 19

62 LP- 276 REV. 9.4.14 f. Replace the (4) screws on the alum

Page 60 - PART 12 – MAINTENANCE

63 LP- 276 REV. 9.4.14 Figure 31

Page 61

64 LP- 276 REV. 9.4.14 Figure 32

Page 62

65 LP- 276 REV. 9.4.14 Figure 33 – NOTE: Ceramic Refractory

Page 63 - Figure 31

66 LP- 276 REV. 9.4.14 Figure 34

Page 64 - Figure 32

67 LP- 276 REV. 9.4.14 Figure 35

Page 65

68 LP- 276 REV. 9.4.14 BOILER START-UP REPORT LIGHT OFF ACTI

Page 66 - Figure 34

69 LP- 276 REV. 9.4.14 INSPECTION ACTIVITIES DATE LAST COMPL

Page 67 - Figure 35

7 LP- 276 REV. 9.4.14 DO NOT USE THIS APPLIANCE IF ANY PART

Page 68 - MAINTENANCE REPORT

70 LP- 276 REV. 9.4.14

Page 69

71 LP- 276 REV. 9.4.14

Page 70

72 LP- 276 REV. 9.4.14 MAINTENANCE NOTES

Page 71

73 LP- 276 REV. 9.4.14 HTP CUSTOMER INSTALLATION RECORD F

Page 72

8 LP- 276 REV. 9.4.14 VWH Recovery Ratings with Storage Tan

Page 73

9 LP- 276 REV. 9.4.14 Mixing factor → Mf = 140 – 40 = 1.43